top of page
Case Study: Critical Pipework Failure, Primary School, Croydon.
A critical pipework failure at Primary School, South Croydon, was swiftly resolved by replacing a corroded 3" steel section with new 3" mapress pipework. The repair restored heating and hot water, ensuring minimal disruption to the school's operations. Notably, the installation was completed without hot works, meeting compliance standards and minimising downtime. The school is now fully operational, providing a warm and safe environment for students to learn and thrive, with no children sent home thanks to the prompt and efficient repair.
.jpeg)

.jpeg)
.jpeg)
bottom of page
